Forestry mulching

Set it on fire... if anyone has a fucking problem with it, they can make the fucking mortgage payments and pay the conservation costs.

When I bought my house the douchebag that owned it before me piled every fucking tree that came down in the back of the lot, maybe about 20 of them... took up about 1/4 acre. I diced it up, put it in the center of the yard and once a week I had a fucking enourmous bonfire when there were no winds. The first 3 fires weren't too bad... but that fourth one... I really was expecting a visit from the police or fire company. The pile was about 6' tall and about 18 feet around when I set it off... no one on this fucking planet was putting that bitch out. Burned for a day and a half and the ground was still hot and smoldering on third afternoon so I finally hosed it off. My wife was coming home from the grovery store about 6 miles from the house... "Uhhhhmmm... did you light that fire? Because I can see smoke and I think even flames from the parking lot in the direction our house is."

My neighbor has since removed his fallen trees and drug some of them into the woods and had someone come and chip the rest up, lol.
 
Should'a got a couple of beavers.

View attachment 3943

These little guys can do some big damage. My old neighbor has a place up north on 120 acres with a river running through it, the beavers are constantly damming it up, I've seen some of the dams, they were 100's of feet across and terraced off, a work of art.
My old neighbor has to have somebody come in and blow it up with dynamite. He says when they blow it you'll see the beavers flying through the air, lol. The next day the beavers are back trying to rebuild, lol.
 
Question: what kinda coin would your company charge for a job like this? Not an actual quote since its sight unseen, just a ball park. Even a day rate would be good. I ask because no way would I do this job for the 3K the machine cost me. More like 5K minimum IMO and I recall some from YB saying 2500 to trench and bury it all. Now that I've been deep inside this stuff, the amount of material alone to shred, chip or burn is beyond massive. Like 10 times what the pics show. The pics don't even come close to showing how bad it really is.
Hard to judge like you said, but on average $2800. Per day full crew.... looked like a day and half maybe. And our stump grinder grinds down 12" from surface.

If we were scheduled for this type of action, we'd show up with 2 chip trucks, 2 chippers, either large or smaller stump grinder..... basically we woulda tag teamed that job hard.

Would be even better if we could dump the chips on site also.
 
Set it on fire... if anyone has a fucking problem with it, they can make the fucking mortgage payments and pay the conservation costs.
Not gonna happen for 2 reasons. For one, I don't want to have to deal with any repercussions from whatever state agencies that oversee wetlands. The other is the causing a major forest fire...there's another 4 or 5 acres of woodlands beyond where I'm ending the clean up. I know how to create a firebreak, but the risk is too high with all the dry fuel everywhere. Plus there is currently a red flag warning in effect.

I'm pleased for the most part with the job this machine is doing.
 
These little guys can do some big damage. My old neighbor has a place up north on 120 acres with a river running through it, the beavers are constantly damming it up, I've seen some of the dams, they were 100's of feet across and terraced off, a work of art.
My old neighbor has to have somebody come in and blow it up with dynamite. He says when they blow it you'll see the beavers flying through the air, lol. The next day the beavers are back trying to rebuild, lol.
The visual of flying beavers made me LMAO
 
so. you have saved a few dollars and raised your blood pressure. having fun yet ? LOL you are handling it well.
Not really concerned about saving a few bucks, blood pressure is fine, and I'm having a blast:cool::p

The last 10 yrs of my working days were the worst of the 40 yrs I spent turning wrenches. Between GM continually cutting warranty labor time and chasing SW's down because they shorted us every chance they got, just so they could pad their paycheck. They are paid bonus based on net. For those last 10 yrs I was a miserable fuck and always pissed off. I made a vow to leave that pissed off attitude at the dealership when I retired. What took a toll was keeping that anger botted up inside me.

Now I live a happy and comfortable life. The days of being pissed off are behind me. Yeah the rental joint annoyed me, but their being decent and making an effort to compensate me for the breakdowns and delays.
 
Hard to judge like you said, but on average $2800. Per day full crew.... looked like a day and half maybe. And our stump grinder grinds down 12" from surface.

If we were scheduled for this type of action, we'd show up with 2 chip trucks, 2 chippers, either large or smaller stump grinder..... basically we woulda tag teamed that job hard.

Would be even better if we could dump the chips on site also.
Thanks, I was curious. I'll say this tho...I question it being a day and a half unless you have a dozen guys willing to do a shit load of hand work. Cutting and dropping trees was the least of my concerns, even though there is a need. The main task was clearing all the underbrush and those damn vines. Had to be a thousand of those mthr fkrs if not more. Then there's all the deadfall scattered everywhere. Whole lot of manual labor unless you have some other means to attack this job? This grinder seems to me to be the only way to tackle this, and its just me doing this entire job, solo...no extra help.

Thanks again as its nice to have at least a ball park # for a days work. You earn your paycheck, that's for sure.
 
Got the machine fixed yesterday bright and early. He stole a joystick from another machine that was torn down in the shop. So far no more issues with raising the grinder and it rolling forward. There is a definitely something still going on with the LH track. Maybe this joystick is bad too? Not so much as what it did Sunday to me, but on the steep incline there were times nobody was home with that track. Not a constant fault but what I discovered was release the joystick when it acted up, and then apply motion again...and it worked. Working on slopes is NOT the place to be when you lose drive motion for a track. I had a job to get done, so I pushed forward. What did concern me was the machine breaking down as far in as I was. Not sure how they would have gotten it out other than drag it with and excavator. Hate to even think of the mess that would leave.

Worked my ass off the last 2 days. Put 12 hrs today and 10 yesterday. Made it to the end of where I wanted to clear. It's 2 am as I post this and I really need to hit the sack soon so I can get up bright and early again. Next couple posts I'll put up some pics with a brief description. Anything further and I'll address it later. I'm F'ing BEAT!!:sleep:
 
Hard to see how steep the slope really is with a pic, but I think these give an idea. I know there are steeper slopes that guys work...shit I'll bet Darren has some stories...but for me it was a bit unnerving at first When I first got started up there, my ass puckered enough that I'm surprised it didn't suck the seatcover off:p, But didn't take long before I was comfortable again after I realized the machine was stable and capable.

Clearing26a.jpgClearing30a.jpgClearing35a.jpg
 
Last one for now. The upper slope is pretty much cleared, which is the last of what I wanted to do. This is after I raked all the crap the machine spit out all over the driveway bank and pulled down far enough to hit it one more time with the grinder. Tomorrow I'll start at the top...you can barely see the machine sitting up there... and work my way to the road grinding up what I raked down. Tomorrow might be the last day with the machine or maybe Thursday. Supposed to rain/snow Thur night into Friday am. Hoping to be done before then.

Clearing38a.jpg
 
Last edited:
That's it for now. Didn't proof anything or make sure the pics were the right ones. I'll worry about it later.

Nite
:sleep::sleep::sleep:
 
Back
Top